Our Offline Stand Builder builds drill pipe stands while drilling continues, removing stand preparation from the critical path. Mechanised tubular handling recovers rig time on every well and keeps crews away from heavy tubulars at the mast.

Recovered Rig Time
Approx. 2–3 days per well (application dependent)
Lifting Capacity
7.1t (15,700 lbs)
Integrated Control
Operated from the existing driller’s console
Designed To Standard
API RP 505 and the European Machinery Directive

Connection challenges

Every minute spent building stands on the drill floor is time that cannot be recovered.

Common stand building challenges include:

  • Stand preparation sitting on the drilling critical path
  • Flat time accumulating section after section
  • Manual stand building on the drill floor
  • Crews working close to heavy tubulars

Drilling contractors are under increasing pressure to:

  • Reduce flat time
  • Improve drilling efficiency
  • Eliminate manual stand building
  • Protect crews from heavy tubular handling
  • Maximise rig utilisation

Stand preparation shouldn’t delay drilling.

Why BENTEC?

Keep Drilling. Build Stands Simultaneously.

Unlike offline cranes or floor-mounted handling systems, our Offline Stand Builder integrates directly into the mast and the driller’s control system, so stands are built while drilling continues.

The BENTEC Offline Stand Builder combines:

  • Stand building removed from the critical path
  • Mechanised tubular handling
  • Console-integrated control
  • Repeatable stand preparation

Repeatable. Monitored. Engineered around your rig.

PLC control governs every movement, with full load and position monitoring across the cycle. Designed around API RP 505 and the European Machinery Directive.

Key benefits

Designed to Deliver

Explore the technology

  • Mast-mounted pipehandler

    Lifting, gripping, rotating and positioning in one system

  • Crown-mounted 7.1t VFD winch

    Variable frequency drive control on every lift

  • Integrated drill pipe grabber

    Hydraulic grabber and tilt system holds the tubular through the cycle

  • PLC control with HMI

    Automated sequences with operator oversight at the console

  • Existing driller’s console integration

    No separate operator station

  • Full load and position monitoring

    Every movement tracked, every cycle

“We were losing hours on every section just preparing stands. Building them offline while the bit stays on bottom takes that straight out of our well time, and our crews are no longer handling tubulars on the drill floor to do it.”

Drilling Superintendent

Land drilling contractor

FAQs

  • It builds and breaks drill pipe stands while drilling continues, moving stand preparation off the drilling critical path.

Need advice on the right solution?

Speak to our drilling equipment specialists about your project requirements.