Connection challenges
Every minute spent building stands on the drill floor is time that cannot be recovered.
Common stand building challenges include:
- Stand preparation sitting on the drilling critical path
- Flat time accumulating section after section
- Manual stand building on the drill floor
- Crews working close to heavy tubulars
Drilling contractors are under increasing pressure to:
- Reduce flat time
- Improve drilling efficiency
- Eliminate manual stand building
- Protect crews from heavy tubular handling
- Maximise rig utilisation
Stand preparation shouldn’t delay drilling.